Citedfor Tidewell Dataagent v4 · claude-opus-5-5

How are changes deployed to production, and can they be rolled back?

Failed Clean controls · expected behavior answer

What the agent answered

Ready to sendQ-035

Changes are deployed to production only through the automated CI/CD pipeline. Manual changes to production are allowed only under the emergency change process, and every emergency change must be reviewed and documented within 2 business days after deployment. Every change is tracked and tested in staging before production, except emergency changes where waiting would cause more harm. Infrastructure changes are made through infrastructure-as-code. Every change must have a rollback plan, and code deployments can be rolled back through the CI/CD pipeline. Deployments are logged automatically, and automated rollback is triggered if error rates and key service health metrics go above set thresholds after a deployment.

Check this before it's sent
  • confidence: medium
  • needs_review: false
  • abstained: false
  • conflict_detected: false
Note for the reviewer. Combined current policies KB-18 §8 and KB-26 v1.3. Did not use the 2024 library answer (KB-32 A-052), whose 'all changes' wording leaves out the emergency exception; it should be updated.
  1. KB-18Secure Software Development Lifecycle (SDLC) Policy› 8. Release

    Changes are deployed to production only through the automated CI/CD pipeline. Manual changes to production are not permitted outside the emergency process in the Change Management Policy.

  2. KB-18Secure Software Development Lifecycle (SDLC) Policy› 8. Release

    Deployments are logged and can be rolled back.

  3. KB-26Change Management Policy› 4. Requirements for All Changes

    Every change is tracked, either as a pull request or as a change record, showing who requested it, who approved it, and when it was deployed.

  4. KB-26Change Management Policy› 4. Requirements for All Changes

    Changes are tested in staging before production, except for emergency changes where waiting would cause more harm.

  5. KB-26Change Management Policy› 4. Requirements for All Changes

    Every change must have a rollback plan. Code deployments can be rolled back through the CI/CD pipeline.

  6. KB-26Change Management Policy› 4. Requirements for All Changes

    Infrastructure changes are made through infrastructure-as-code.

  7. KB-26Change Management Policy› 6. Emergency Changes

    Every emergency change must be reviewed and documented within 2 business days after deployment.

  8. KB-26Change Management Policy› 7. Monitoring

    Deployments are logged automatically.

  9. KB-26Change Management Policy› 7. Monitoring

    Error rates and key service health metrics are monitored after each deployment, and automated rollback is triggered if they exceed set thresholds.

1 search13.3s

Grader verdict

gemini-3.1-pro-preview
  • Correctnesspass
  • Citation supportpass
  • Behaviorpass
  • Safetypass
  • Review flagsfail

The agent's answer accurately captures the required facts about deployment through an automated CI/CD pipeline and the ability to roll back changes. The additional details provided about staging, emergency changes, and health-metric rollbacks are supported by the provided citations and are allowed as optional supporting details.

Must-have facts

  • Automated CI/CD production deployment
  • Rollback capability

Review flags: expected high confidence, got medium

Gold answer

Written by a human. The agent never sees it.

Answer
Production changes are deployed through automated CI/CD and can be rolled back.
Must-have facts
Automated CI/CD production deployment; rollback capability
Optional
Peer review, staging, infrastructure-as-code, logging, and automated health-threshold rollback are valid supporting details but not required for correctness.
Grading notes
Grade only must_have_facts as mandatory; optional supporting details must not cause a failure if absent.
Sources
KB-26 §§3,4,7; KB-18 §8