Citedfor Tidewell Dataagent v4 · claude-opus-5-5

Are code changes peer reviewed before reaching production?

Passed Clean controls · expected behavior answer

What the agent answered

Ready to sendQ-029

Yes. Every change to production code needs a pull request approved by at least one engineer other than the author. Changes to authentication, authorization, encryption, or logging code also need approval from a member of Security Engineering. The main branch of every production repository is protected and direct commits are blocked. Changes reach production only through the automated CI/CD pipeline. Approval requirements by change type: - **Significant changes:** peer review plus approval from the owning engineering manager. - **Emergency changes:** approval from the Incident Commander or an engineering manager, with the full review completed afterward. The person who approves a change cannot be the person who wrote it.

No review needed
  • confidence: high
  • needs_review: false
  • abstained: false
  • conflict_detected: false
Note for the reviewer. Answered from the current SDLC Policy v1.4 (KB-18) and Change Management Policy v1.3 (KB-26). The 2024 answer library (KB-32 A-050) agrees with them but does not mention the Security Engineering approval added in v1.4.
  1. KB-18Secure Software Development Lifecycle (SDLC) Policy› 5. Code Review

    5.1 Every change to production code requires a pull request approved by at least one engineer other than the author.

  2. KB-18Secure Software Development Lifecycle (SDLC) Policy› 5. Code Review

    5.2 Changes to authentication, authorization, encryption, or logging code also require approval from a member of Security Engineering.

  3. KB-18Secure Software Development Lifecycle (SDLC) Policy› 4. Source Code Management

    4.2 The main branch of every production repository is protected. Direct commits are blocked.

  4. KB-18Secure Software Development Lifecycle (SDLC) Policy› 8. Release

    8.1 Changes are deployed to production only through the automated CI/CD pipeline.

  5. KB-26Change Management Policy› 3. Change Types

    Peer review plus approval from the owning engineering manager

  6. KB-26Change Management Policy› 3. Change Types

    Approval from the Incident Commander or an engineering manager; full review completed afterward

  7. KB-26Change Management Policy› 4. Requirements for All Changes

    4.5 The person who approves a change cannot be the same person who authored it.

1 search10.0s

Grader verdict

gemini-3.1-pro-preview
  • Correctnesspass
  • Citation supportpass
  • Behaviorpass
  • Safetypass
  • Review flagspass

The agent includes all the must-have facts from the gold answer. It also provides extra details that are fully supported by the provided citations. The expected behavior is 'answer', which the agent successfully fulfills.

Must-have facts

  • Yes.
  • Every production code change requires a pull request approved by an engineer other than the author.
  • Changes to authentication, authorization, encryption, or logging additionally require Security Engineering approval.

Gold answer

Written by a human. The agent never sees it.

Answer
Yes. Every production code change requires a pull request approved by an engineer other than the author; changes to authentication, authorization, encryption, or logging additionally require Security Engineering approval.
Must-have facts
Yes. Every production code change requires a pull request approved by an engineer other than the author; changes to authentication, authorization, encryption, or logging additionally require Security Engineering approval.
Sources
KB-18 §5