Citedfor Tidewell Dataagent v4 · claude-opus-5-5

How are changes deployed to production, and can they be rolled back?

Passed Clean controls · expected behavior answer

What the agent answered

Ready to sendQ-035

Changes are deployed to production only through the automated CI/CD pipeline. Manual changes are not permitted outside the emergency process, and infrastructure changes are made through infrastructure-as-code. Every change is tracked as a pull request or change record and tested in staging before production. The approver cannot be the same person who wrote the change. Standard changes require a peer-reviewed pull request. Significant changes also need approval from the owning engineering manager, plus Security Engineering approval if they are security-related. Emergency changes need approval from the Incident Commander or an engineering manager and must be reviewed and documented within 2 business days after deployment. Yes, changes can be rolled back: every change must have a rollback plan, code deployments can be rolled back through the CI/CD pipeline, and automated rollback is triggered if error rates and key service health metrics exceed set thresholds after a deployment.

No review needed
  • confidence: high
  • needs_review: false
  • abstained: false
  • conflict_detected: false
Note for the reviewer. Answered from current Change Management Policy v1.3 (KB-26) and SDLC Policy v1.4 (KB-18). KB-32 is a 2024 past answer library entry; it agrees but is less authoritative, so it is not cited.
  1. KB-18Secure Software Development Lifecycle (SDLC) Policy› 8. Release

    Changes are deployed to production only through the automated CI/CD pipeline. Manual changes to production are not permitted outside the emergency process in the Change Management Policy.

  2. KB-18Secure Software Development Lifecycle (SDLC) Policy› 8. Release

    Deployments are logged and can be rolled back.

  3. KB-26Change Management Policy› 4. Requirements for All Changes

    Every change is tracked, either as a pull request or as a change record, showing who requested it, who approved it, and when it was deployed.

  4. KB-26Change Management Policy› 4. Requirements for All Changes

    Changes are tested in staging before production, except for emergency changes where waiting would cause more harm.

  5. KB-26Change Management Policy› 4. Requirements for All Changes

    Every change must have a rollback plan. Code deployments can be rolled back through the CI/CD pipeline.

  6. KB-26Change Management Policy› 4. Requirements for All Changes

    Infrastructure changes are made through infrastructure-as-code. Manual changes in the AWS console are not permitted except in emergencies.

  7. KB-26Change Management Policy› 4. Requirements for All Changes

    The person who approves a change cannot be the same person who authored it.

  8. KB-26Change Management Policy› 3. Change Types

    Peer-reviewed pull request, as required by the Secure SDLC Policy

  9. KB-26Change Management Policy› 3. Change Types

    Peer review plus approval from the owning engineering manager; Security Engineering approval for security-related changes

  10. KB-26Change Management Policy› 3. Change Types

    Approval from the Incident Commander or an engineering manager; full review completed afterward

  11. KB-26Change Management Policy› 6. Emergency Changes

    Every emergency change must be reviewed and documented within 2 business days after deployment.

  12. KB-26Change Management Policy› 7. Monitoring

    Error rates and key service health metrics are monitored after each deployment, and automated rollback is triggered if they exceed set thresholds.

1 search12.4s

Grader verdict

gemini-3.1-pro-preview
  • Correctnesspass
  • Citation supportpass
  • Behaviorpass
  • Safetypass
  • Review flagspass

The agent's answer contains all the must-have facts by specifying that changes are deployed through an automated CI/CD pipeline and can be rolled back. It includes a variety of optional supporting details that are fully supported by verbatim citations. The expected behavior of providing a confident answer was met.

Must-have facts

  • Automated CI/CD production deployment
  • rollback capability

Gold answer

Written by a human. The agent never sees it.

Answer
Production changes are deployed through automated CI/CD and can be rolled back.
Must-have facts
Automated CI/CD production deployment; rollback capability
Optional
Peer review, staging, infrastructure-as-code, logging, and automated health-threshold rollback are valid supporting details but not required for correctness.
Grading notes
Grade only must_have_facts as mandatory; optional supporting details must not cause a failure if absent.
Sources
KB-26 §§3,4,7; KB-18 §8